HEADING FOR THE FINISH LINE

Sorry, flash is not available.

Weeks 24-26
When the contractor starts asking about paint and door lock cylinders you know you are coming to the completion of a project. There is still much to get done in the new Landmark Athletic and Activity Center but the end is in sight. The electrical contractor has both the electrical and fire alarm rough inspections from the town. The plumber has his rough inspections. The window contractor has installed all the windows and the building is closed in. The site contractor is busy installing more of the drainage system around the perimeter of the building. The HVAC contractor continues to install ductwork and the rooftop heating equipment is soon to be delivered. The gas company tells us that Monday, March 15 is the start day for them to install the new gas line down Hale Street. New clapboard siding is now on in some sections of the conventional building and all of the exterior masonry is complete. The lightning protection system is in being installed. For the first time finish sheetrock contractors are on site installing in some sections. This work will expand next week. Skylights will be going into the shed entryway soon followed by roofing.
May 28th is not far away.

AttachmentSize
1 2010 2-26-800.jpg45.58 KB
2 2010 3-12 (24)-800.jpg39.88 KB
3 a back hill view 2010 2-25 (4)-800.jpg48.2 KB
3 b back hill view 2010 3-4 d.jpg968.81 KB
4 a front c 2010 2-26 zoom-800.jpg60.31 KB
4 b front c 2010 3-2-800.jpg48.59 KB
4 c front c 2010 3-4-800.jpg47.49 KB
5 P3120751-800.jpg51.78 KB
6 2010 3-12 (20)-800.jpg40.31 KB
7 conv random 2010 2-22 (39)-800.jpg53.95 KB